首页 >  Term: available but not needed capability
available but not needed capability

Net capability of main generating units that are operable but not considered necessary to carry load and cannot be connected to load within 30 minutes.

0 0

创建者

  • Pud6
  •  (Gold) 2324 分数
  • 100% positive feedback
© 2025 CSOFT International, Ltd.