首页 > Term: basic IRR rule
basic IRR rule
Accept the project if IRR is higher than the discount rate; reject the project if it is lower than the discount rate. It is wise to also consider net present value for project evaluation.
0
创建者
- Jessehe
- 40.13% positive feedback