首页 > Term: bottom-up estimating
bottom-up estimating
A principle of good scheduling. It means having those who do the work estimate the effort, rolling up task-level estimates, and recognizing that experience is the best estimating technique.
0
创建者
- Maxiao
- 100% positive feedback