首页 >  Term: budget at completion
budget at completion

The original project, resource, and assignment cost as shown in the baseline plan. The baseline cost is a snapshot of the cost at the time when the baseline plan was saved.

0 0

创建者

  • Romain
  •  (V.I.P) 17515 分数
  • 44.44% positive feedback
© 2024 CSOFT International, Ltd.