首页 >  Term: permanent shaft support
permanent shaft support

After a shaft has been sunk to a certain depth, the final or permanent lining is inserted. This may consist of: brick walling; concrete blocks shaped to the curvature of the shaft; concrete lining put in liquid form behind shuttering; brick coffering; and cast-iron tubbing. The permanent lining is generally built up in sections, during which operation the temporary lining (such as skeleton tubbing) is removed. Concrete is now widely used as a permanent shaft support.

0 0

创建者

  • ed.young
  • (Milwaukee, United States)

  •  (V.I.P) 21084 分数
  • 100% positive feedback
© 2024 CSOFT International, Ltd.