首页 >  Term: power ascension
power ascension

The period of time between a plant's initial fuel loading date and its date of first commercial operation (including the low-power testing period). Plants in the first operating cycle (the time from initial fuel loading to the first refueling), which lasts approximately 2 years, operate at an average capacity factor of about 40 percent.

0 0

创建者

  • Pud6
  •  (Gold) 2324 分数
  • 100% positive feedback
© 2025 CSOFT International, Ltd.