首页 > Term: program acquisition cost
program acquisition cost
The estimated cost of development (RDT&E), procurement, and system specific military construction (MILCON) necessary to acquire the defense system. RDT&E costs shall be accumulated from the point in time when the DoD acquisition program is designated by title as a program element or major project within a program element. MILCON costs shall include only those projects that directly support and uniquely identify with the system.
- 词性: noun
- 行业/领域: 军事
- 类别 Missile defense
- Company: U.S. DOD
0
创建者
- mf1967
- 100% positive feedback
(Oklahoma, United States of America)