首页 >  Term: schedule variance
schedule variance

The difference between the budgeted cost of work performed (BCWP) and the budgeted cost of work scheduled (BCWS). This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled.

0 0

创建者

  • Romain
  •  (V.I.P) 17515 分数
  • 44.44% positive feedback
© 2024 CSOFT International, Ltd.